(Created page with "Category:Spring 2012 {{Template:20.345}} {{Template:LeannaSp12}}<br> == Week 5 - Mar 4-10 == === Mar 5 === * Slaving on the wiki. Put in a simple navbar, reorganization. Did...")
 
Line 10: Line 10:
 
* BIG MANUPS got the code to actually work. After thinking and talking with Steve about what voltage to subtract and where, the stage finally moves towards the center after 1 cycle in each direction, given that the amplitude is large enough to see the entirety of the bead.
 
* BIG MANUPS got the code to actually work. After thinking and talking with Steve about what voltage to subtract and where, the stage finally moves towards the center after 1 cycle in each direction, given that the amplitude is large enough to see the entirety of the bead.
 
=== Mar 1 ===
 
=== Mar 1 ===
* Wrote code to sort tether data into a force-displacement curve and used nlinfit to determine contour and persistence lengths. See [[Spring_2012:Leanna_Morinishi_Lab_1 | Leanna Morinishi Lab 1]].
+
* Wrote code to sort tether data into a force-displacement curve and used nlinfit to determine contour and persistence lengths.
 +
* [http://web.mit.edu/leanna/Public/persistenceLength.m Calculate persistence and contour lengths by nlinfit]
 +
* [http://web.mit.edu/leanna/Public/forceApplied.m Force Function for nlinfit]
 
=== Feb 28 ===
 
=== Feb 28 ===
 
* Got integration working, Also, the stage is moving nicely, we are currently using 3 sinusoidal cycles, but for the sake of the tether, we will begin to cut this down to 1 in each direction.
 
* Got integration working, Also, the stage is moving nicely, we are currently using 3 sinusoidal cycles, but for the sake of the tether, we will begin to cut this down to 1 in each direction.

Revision as of 18:44, 5 March 2012

20.345: Bioinstrumentation Project Lab
20.345: Bioinstrumentation Project Lab

Leanna        Notebook        Lab I        Lab II        Final Project       20.345 Main        Sp12 Projects       


Week 5 - Mar 4-10

Mar 5

  • Slaving on the wiki. Put in a simple navbar, reorganization. Did some literature searching, and started my objectives for the final project. Will be working with AJ and Vincent on Lab II.

Week 4 - Feb 26-Mar 3

Mar 2

  • BIG MANUPS got the code to actually work. After thinking and talking with Steve about what voltage to subtract and where, the stage finally moves towards the center after 1 cycle in each direction, given that the amplitude is large enough to see the entirety of the bead.

Mar 1

Feb 28

  • Got integration working, Also, the stage is moving nicely, we are currently using 3 sinusoidal cycles, but for the sake of the tether, we will begin to cut this down to 1 in each direction.
  • Switched gears a bit so that we no longer invoke piezos, we give a voltage and redefine a new UiSettings attribute in each round.

Week 3 - Feb 19-25

Feb 25

  • Integrated with OTKB and tried to open communication with GUI, it's a start

Feb 23

  • Met with AJ, decided to pair up, shared code

Feb 20

  • 3pm Moved some voltage through the DAQ today. Worked on understanding time, SampleRate, SamplesPerTrigger, TriggerRepeat, RepeatOutput, establishing channels, starting and stopping data output and input.

Week 2 - Feb 12-18

Feb 15

  • 1.30pm DNA Tether Prep with Marie's leftover materials, Steve found a few attached beads on his samples, I found one.

Feb 13

  • 12pm Walkthrough of OTKB software and took some great calibration data at 20mW 70mW and 120mW of .97 micron beads.

Week 1 - Feb 6-11

References