Difference between revisions of "Weekly Progress Reports"
From Course Wiki
(→* March 14) |
|||
Line 1: | Line 1: | ||
− | == | + | ==March 14== |
− | Work: | + | ===Work:=== |
+ | |||
- Researching different printer methodologies (i.e., piezoelectric vs thermal drop-on-demand) | - Researching different printer methodologies (i.e., piezoelectric vs thermal drop-on-demand) | ||
+ | |||
- Attempted contact with T. Boland and other leaders in the cell printing field | - Attempted contact with T. Boland and other leaders in the cell printing field | ||
− | + | ||
+ | |||
+ | ===Risks identified:=== | ||
− | |||
- Determining an existing printing platform on which to actually build the device will be difficult | - Determining an existing printing platform on which to actually build the device will be difficult | ||
+ | |||
- Key considerations include: | - Key considerations include: | ||
- How easy will this printer sync with my computer? | - How easy will this printer sync with my computer? | ||
- How accessible are the printer drivers? | - How accessible are the printer drivers? | ||
- Which printer is the least sensitive to having components removed or altered? | - Which printer is the least sensitive to having components removed or altered? | ||
− | |||
==* March 21== | ==* March 21== |
Revision as of 20:56, 18 May 2011
Contents
March 14
Work:
- Researching different printer methodologies (i.e., piezoelectric vs thermal drop-on-demand)
- Attempted contact with T. Boland and other leaders in the cell printing field
Risks identified:
- Determining an existing printing platform on which to actually build the device will be difficult
- Key considerations include:
- How easy will this printer sync with my computer? - How accessible are the printer drivers? - Which printer is the least sensitive to having components removed or altered?
* March 21
Work: Next steps: Risks identified:
* March 28
Work: Next steps: Risks identified:
* April 4
Work: Next steps: Risks identified:
* April 11
Work: Next steps: Risks identified:
* April 18
Work: Next steps: Risks identified:
* April 25
Work: Next steps: Risks identified:
* May 2
Work: Next steps: Risks identified:
* May 9
Work: Next steps: Risks identified:
Note: Much of this electronic documentation has been done retrospectively, taken from actual lab notebook.