Difference between revisions of "Weekly Progress Reports"

From Course Wiki
Jump to: navigation, search
(* March 14)
Line 1: Line 1:
==* March 14==
+
==March 14==
Work:  
+
===Work:===
 +
 
 
- Researching different printer methodologies (i.e., piezoelectric vs thermal drop-on-demand)
 
- Researching different printer methodologies (i.e., piezoelectric vs thermal drop-on-demand)
 +
 
- Attempted contact with T. Boland and other leaders in the cell printing field
 
- Attempted contact with T. Boland and other leaders in the cell printing field
-
+
 +
 
 +
===Risks identified:===
  
Risks identified:
 
 
- Determining an existing printing platform on which to actually build the device will be difficult
 
- Determining an existing printing platform on which to actually build the device will be difficult
 +
 
- Key considerations include:
 
- Key considerations include:
 
       - How easy will this printer sync with my computer?
 
       - How easy will this printer sync with my computer?
 
       - How accessible are the printer drivers?
 
       - How accessible are the printer drivers?
 
       - Which printer is the least sensitive to having components removed or altered?
 
       - Which printer is the least sensitive to having components removed or altered?
 
  
 
==* March 21==
 
==* March 21==

Revision as of 20:56, 18 May 2011

March 14

Work:

- Researching different printer methodologies (i.e., piezoelectric vs thermal drop-on-demand)

- Attempted contact with T. Boland and other leaders in the cell printing field


Risks identified:

- Determining an existing printing platform on which to actually build the device will be difficult

- Key considerations include:

      - How easy will this printer sync with my computer?
      - How accessible are the printer drivers?
      - Which printer is the least sensitive to having components removed or altered?

* March 21

Work: Next steps: Risks identified:


* March 28

Work: Next steps: Risks identified:


* April 4

Work: Next steps: Risks identified:


* April 11

Work: Next steps: Risks identified:


* April 18

Work: Next steps: Risks identified:

* April 25

Work: Next steps: Risks identified:

* May 2

Work: Next steps: Risks identified:

* May 9

Work: Next steps: Risks identified:


Note: Much of this electronic documentation has been done retrospectively, taken from actual lab notebook.