- Defined a modified equipment list with the help of Uli and Jeff at the Danuser lab (simplified design without TIRF and a single laser)
 
- Defined a modified equipment list with the help of Uli and Jeff at the Danuser lab (simplified design without TIRF and a single laser)
Line 11: Line 11:
 
- The microscope at station 3 was approved for use with the e-STORM project, with minor modifications depending on the specific parts acquired
 
- The microscope at station 3 was approved for use with the e-STORM project, with minor modifications depending on the specific parts acquired
  
=== Next Week: ===
+
=== Next Week ===
  
 
- A final equipment list will be compiled and quotes will be obtained
 
- A final equipment list will be compiled and quotes will be obtained
Line 19: Line 19:
 
- Work will start with the image analysis programming, including the analysis of code obtained from the Danuser lab plus literature reading
 
- Work will start with the image analysis programming, including the analysis of code obtained from the Danuser lab plus literature reading
  
=== Risks and Issues: ===
+
=== Risks and Issues ===
  
 
- The adoption of the microscope frame at station 3 might be premature depending on the final parts and design we acquire
 
- The adoption of the microscope frame at station 3 might be premature depending on the final parts and design we acquire

Revision as of 16:02, 18 March 2011

Week 03/14 – 03/18

This Week

- Defined a modified equipment list with the help of Uli and Jeff at the Danuser lab (simplified design without TIRF and a single laser)

- Research was made on the best choices for lasers, cameras and objectives

- The microscope at station 3 was approved for use with the e-STORM project, with minor modifications depending on the specific parts acquired

Next Week

- A final equipment list will be compiled and quotes will be obtained

- Ideally, the equipment will be ordered

- Work will start with the image analysis programming, including the analysis of code obtained from the Danuser lab plus literature reading

Risks and Issues

- The adoption of the microscope frame at station 3 might be premature depending on the final parts and design we acquire

- There might be a fair amount of experimentation with the setup since we are using the most minimalist approach possible

- There is a delay on the planned time for part ordering, which has to be addressed next week or shipping and processing time might interfere with the project execution