Spring 11:QRT-PCR

From Course Wiki
Revision as of 23:28, 20 March 2011 by Kristin Kuhn (Talk | contribs)

Jump to: navigation, search

Looking for weekly reports?

To-Do

  • research what to order for heated lid

Weekly goals

  • 3/25: Optics finished. Code started.
  • 4/1: Heated lid finished.
  • 4/8: Updated heat transfer function. Successful PCR.
  • 4/15: QRT-PCR code finished.
  • 4/22: Setup is ready for QRT-PCR. (i.e., the mechanical setup works)
  • 4/29: Successful QRT-PCR from the side.
  • 5/6: QRT-PCR from the top. Now which one was better?

Progress Notes

3/20/11

Based on model system (blue LED + ND filter), I don't think gain is high enough. Increased gain of transimpedance amp from 2.5e4 to 2.5e5.

3/18/11

Optical setup appears to be working.

3/16/11

Added dichroic mirror.

Question: how can I verify the optical setup? it seems to respond to driving signal, not fluorescence.

TODO: put away 25mm lens